8. Tools for Installation and
Adjustment
To ensure proper installation and adjustment, please
prepare the following tools::
Tool
Leveling instrument
Chalk line
Hammer
Medium crescent wrench
Open-end wrench set
Ratchet socket set
Flat Screw driver
Rotary hammer drill
Concrete drill-bit

9. Unpacking

Open the packing box; remove the packing materials and
inspect the lift for any sign of shipment damage. Check by
packing list to see if the main parts and accessories are
complete.
Keep the packing materials away from the children to avoid
danger; if the packing materials cause the pollution, they
shall be treated properly.

10. Installation

10.1 Important notice

The wrong installation will cause the lift damage or
personal injury. The manufacturer will not undertake
any responsibilities for any damage caused due to
incorrect installation and usage of this equipment,
whether directly or indirectly.
The correct installation location shall be "horizontal"
floor to ensure the horizontal lifting. The slightly slope
floor can be corrected by proper shimming. Any big
slope will affect the height of the lifting pad when at
the bottom or the horizontal lifting. If the floor is of
questionable slope, consider a visual inspection, or
Model
Carpentry type
Min 4.5m
1.5kg
40mm
11mm-23mm
150mm
20mm
¢19mm
TLT235、TLT240 Economical Two-post User's Manual
pour a new horizontal concrete slab if possible. In
short, under the optimum horizontal lifting status, the
level of the lifting relies on the level of the floor where
it is installed. Don't expect to compensate for the
serious slope.
Don't install the lift on any asphalt surface or any
surface other than concrete. The lift must be installed
on concrete floor conforming to the minimum
requirement showed in this manual. Don't install the
lift on the concrete with seams or crack and defect.
Please check together with the architect.
Without the written approval of the architect, don't
install the lift on a second floor with basement.
Overhead obstruction: The lift installation area can't
have any overhead obstruction, such as heater,
building support, electrical pipe, etc.
Concrete drilling test: The installation personnel can
test the concrete thickness at each site by drilling test.
If several lifts are installed at one place, it is preferred
to make drilling test in each site.
Power supply: Get ready the power supply before the
installation. All the electric wiring and connecting
should be performed by a certified electrician.

10.2 Installation Procedure

10.2.1 Selecting installation site

Selecting installation site based on the following conditions:
Lift can only be installed on concrete slab, which
must have a minimum thickness of 250mm and
should be aged 7days at least .
The concrete slab shall have reinforcement by steel
bar.
The concrete slab must be leveled.
If the thickness of the whole ground concrete is
greater than 250mm, the lift can be installed directly
Check the possible obstruction, e.g. low ceiling, top
pipeline, working area, passage, exit, etc.
The front and back of the lift should be reserved with
sufficient space to accommodate all the vehicles (Fig.
8).(evaluating from the center line ,each edge should
be about 4m)