Page 2
Assembly Instruction PRODUCT SIZE(LxWxH): 189 X 250 X 228CM PLEASE READ CAREFULLY BEFORE ASSEMBLY...
Page 3
CONTENTS 1. Assembly Advice ..............Page 1 2. Product Features ..............Page 2 3. Parts List ................Page 3 - 4 4. Door Assembly ..............Page 5 - 6 5. Roof Vent Assembly ............Page 7 - 8 6. Base Assembly ..............Page 9 -10 7. Framework & Glazing Assembly ........Page 11 - 22...
Page 4
Assembly and Maintenance Advice 1. For safety purposes, we strongly recommend that this product is assembled by at least two people. 2. Some components have sharp metal edges. Please be careful when handling metal components. Please wear gloves, shoes and safety goggles during assembly. 3.
Page 5
Functions and Features: 1. The strong two part eaves beam includes an integral gutter. Downpipes are also included as standard so you can collect rainwater. 2. Manual window handles are included as standard with the roof vents. If required, automatic roof vent openers are available as an inexpensive optional extra. Automatic Opener Manual Opener 3.
Page 6
door PART PART windowsX2 L01A Part QTY. L01B J56R NO. QTY. Part L18A L01C J56L L11A L18B L01D J90R L12A L02A J90L L02B L16A L02C L16B L02D L02E L02F L02G L04A PART M6X12 L04B M6X20 L05A L05B Ø4X25 L06C Ø4X16D M6X12 Tools Provided: L07C...
Page 7
PART Rubber PART J107 Rubber for walls & roof (Provided for glass only) PART J107 Rubber for walls only (Provided for glass only) PC/Glass N0.1...
Page 8
Part Part QTY. QTY. L18A L16A L16B L18A L16A Ø4X25 L16B L18A...
Page 9
Part Part QTY. QTY. L18A L18B L16B L18B L16B Ø4X25 L16B L18A...
Page 10
NO. QTY. NO. QTY. Part Part L11A L12A Ø4X16D Step 1 Ø4X8 M4.2X16 Step 2 Step 3...
Page 11
L12A L11A L11A L12A L11A is factory fitted to L12A already Two windows are standard...
Page 12
PART M6X12 M4.2X16 FRONT About 100mm distance BACK between two Z08 GP933 Fix the base before assembly the greenhouse. This is the way to fix the base. L06C L05C L07C L05C L08C L08C L05C L07C L05C L06C...
Page 13
GP933 PART Attention: If glass is chosen, please seal it with rubber(J11) provided after the whole assembly is finished. Rubber is not provided if you choose polycarbonate sheet as glazing panel.
Page 14
PART L01A L01B L01B L08C L01A L08D L01A L01B M4.2X16 M6X12 L01A&B 1. Fix the glazing bars (2 x L01A and 2 x L01B) to the cills (L10 and L08D, 2 x L08C) with S01 & M01 provided. 2. Fix the cills to the base with Z08, using a powered screwdriver.
Page 15
PART L07C L23C M6X12 1. Fix 2 x L07C eaves to L01A & L01B, using S01 & M01. 2. Fix 2 x L23C to L01A & L01B, using S01 & M01. L07C L07C L23C L23C...
Page 16
PART L02G L02F L02C L02E L02D L02E L02F L02G L23A L23D L05A M6X12 L02C L02D L02C&D&E&F&G Fix L02C & L02D to cill L10; L02E, L02F & L02G to cill L08D, L02C&D&E&F L02G using S01 & M01. Slide 2 bolts (S01) into L02G bolt channel.
Page 17
PART L02A L07C L02A L07C M6X12 L23C Fix L02A (4pcs) to L08C and L07C using S01 & M01. L08C L08C L02A L02A L07C Slide 2 bolts (S01) into each L02A bolt channel. One is to fix L23C, the other is to be used later for fixing L05B Slide the glazing panel Y2 into positions...
Page 18
PART L04A M6X12 L04A L04A L04A L04A Fix bracings L04A (6pcs) as above, using S01 & M01. S01X2 L04A L04A L04A L04A Slide the glazing panel Y6 into positions...
Page 19
PART L04B L04B L13A L13A M6X12 L13A S01X2 L02C L02E L02D L02F L13A L13A L04B Preload the bolts S01 & M01 to L02E & L02F Fix L13A to L02C & L02D before sliding the panels into positions. with S01 & M01. Slide 2*S01 into the channel of L04B S01X2...
Page 20
PART L01D L01C L01C L01D L01C L01D M6X12 L01C&D L01C&D 1. Preload S01 & M01 on L01C and L01D before fixing them to L01A/L01B. See figue 1 & 2. L01C&D 2. Bolt L01C and L01D with plate D17, using S01 & M01 preloaded.
Page 21
PART L06C L06C L02B M6X12 Bolt the ridge L06C to L01C & L01D, using S01 & M01. L02B Fix glazing bars L02B (4pcs) to the eaves and the ridge profiles with S01 & M01 L06C Slide 3 bolts (S01) into L02B each L02B bolt channel L02B...
Page 22
PART L23C L05B M6X12 Bolt L05B (6 pcs) to L02A & L02B using the S01 bolt placed in the bolt channel earlier. L05B L23C L02B L02A L05B L05B Bolt L23C to L01C & L01D with S01 & M01. Bolt L23C (2 pcs) to L02B using the S01 bolt placed in the bolt channel earlier.
Page 23
PART L04A Firstly, slide the glazing panel Y9 into the channel of L02B WINDOW WINDOW M6X12 L04A L04A L02B L04A S01X4 Slide 4 bolts (S01) into each L04A bolt channel. 2 to be fixed with A03, and another 2 to be L11A fixed with L02B.
Page 24
PART L09C After the panels and windows are in position, D00R-R put some silicone sealant around to avoid leaking water. D00R-L M6X12 M6X20 L09C DOOR-L DOOR-R L09C L13A L07C When the panels are completely S02X3 inserted, fix gutter profile L09C. Tap it gently into position with a rubber mallet.
Page 25
PART L23F J90L J56R L23F J56L J90R J90R J56L J90L J56R M4.2X16 Ø4X16D Ø4X8 J90L/R L23F Fix L23F (2pcs), one end to L14 Fix the cover caps J55 Fix the cover caps (J90L/R) and the other end to L09C through into the ridge profile carefully with Z04.
Page 26
Head office: Dancover A/S For more information Lyngevej 16A, Nørre Herlev please visit: 3400 Hillerød www.dancovershop.com Denmark...
Need help?
Do you have a question about the ZEN 4.73M2 and is the answer not in the manual?
Questions and answers