Download Print this page

Kohler K-702300 Installation Manual page 4

Neo-angle shower door
Hide thumbs Also See for K-702300:

Advertisement

Available languages

Available languages

Remove a Wall Jamb
from each side panel.
Mark the mounting holes
Remove a Wall Jamb
from each side panel.
Sealing
Groove
Side Panel
1. Mark and Drill the Mounting Holes
Remove the wall jamb from each side panel.
Measure from the inside edge of the shower receptor and mark 35-1/2" (90.2 cm) (A on the
diagram) on the receptor ledge near the wall.
Place the sealing groove of the wall jamb against the wall toward the outside of the shower.
Align the inside edge of the wall jamb with the mark on the receptor ledge.
Using a level, plumb the wall jamb and mark the five wall mounting holes. Repeat for the other
wall jambs.
Drill a hole at each marked location with a 5/16" drill bit.
Thoroughly clean the receptor ledge and the wall.
2. Install the Adjustment Blocks
Lay the wall jamb on a flat surface.
Slide an adjustment block into each end of the channel of the wall jamb. The base of the adjustment
block should slide under the wall jamb channel lip.
Position the adjustment blocks over the end holes of the wall jambs.
To secure the adjustment block, hold the block in place and press down firmly with the screwdriver
blade to crimp the wall jamb lip.
Crimp the wall jamb channel lip on both sides of the block. Tap the screwdriver with a hammer if
necessary.
Repeat for the other wall jamb.
1032629-2-B
Top View
Wall Jamb
Shower
Receptor
Be sure Sealing groove is
against wall toward the
outside of the shower.
Pencil
Wall
Jamb
Level
Outside of Shower
A
Receptor Ledge
4
Adjustment
Screw
Adjustment
Block
Location
Groove
Wall Jamb
Channel Lip
Wall
Jamb
Kohler Co.

Advertisement

loading