Carrier N92ESN Installation, Start-Up, Operating And Service And Maintenance Instructions page 44

Single-stage, 35-in. (889 mm) tall, 4-way multipoise high efficiency condensing gas furnace
Table of Contents

Advertisement

N92ESN: Installation, Start-up, Operating and Service and Maintenance Instructions
3. Pilot drill the screw holes for the adapter in the casing and attachthe
vent pipe adapter to the furnace with sheet metal screws
4. Slide the end of the rubber vent coupling with notches in it over the
standoffs on the vent pipe adapter.
5. Insert a length of vent pipe through the coupling into the outlet of
the vent elbow.
6. Tighten the clamp around the outlet of the vent elbow. Torque the
clamp to 15 lb-in.
!
The following instructions are for PVC/ABS DWV vent piping only.
DO NOT USE THESE TECHNIQUES FOR POLYPROPYLENE
VENT PIPING SYSTEMS. See the polypropylene vent system
manufacturer's instructions for installing polypropylene venting
systems.
Install the remaining vent and combustion air pipes as shown below. It is
recommended that all pipes be cut, prepared, and pre-assembled before
permanently cementing any joint.
1. Working from furnace to outside, cut pipe to required length(s).
2. De-burr inside and outside of pipe.
3. Chamfer outside edge of pipe for better distribution of primer and
cement.
4. Clean and dry all surfaces to be joined.
5. Check dry fit of pipe and mark insertion depth on pipe.
6. Insert the vent pipe into the vent elbow.
7. Torque clamp on vent elbow 15 lb-in.
8. Torque clamp on vent coupling 15 lb-in.
9. Insert the combustion air pipe into the adapter.
10. Pilot drill a screw hole through the adapter into the combustion air
pipe and secure the pipe to the adapter with sheet metal screws. DO
NOT DRILL INTO POLYPROPYLENE VENT PIPES. Use an
optional accessory vent coupling, if needed.
11. Seal around the combustion air pipe with silicone or foil tape.
SILICONE SEALERS MAY NOT BE APPROPRIATE FOR
POLYPROPYLENE
POLYPROPYLENE VENT SYSTEM MANUFACTURER'S
INSTRUCTIONS.
12. After pipes have been cut and pre-assembled, apply generous layer
of cement primer to pipe fitting socket and end of pipe to insertion
mark. Quickly apply approved cement to end of pipe and fitting
socket (over primer). Apply cement in a light, uniform coat on
inside of socket to prevent buildup of excess cement. Apply second
coat. DO NOT CEMENT POLYPROPYLENE FITTINGS.
13. While cement is still wet, twist pipe into socket with 1/4-in. turn.
Be sure pipe is fully inserted into fitting socket.
14. Wipe excess cement from joint. A continuous bead of cement will
be visible around perimeter of a properly made joint.
15. Handle pipe joints carefully until cement sets.
16. Horizontal portions of the venting system shall be supported to
prevent sagging. Space combustion air piping and vent piping
hangars as shown in
Table
hanging strap or commercially available hangars or straps designed
to support plastic pipe.
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
NOTICE
VENT
SYSTEMS.
16. Support pipes using perforated metal
Diameter
PVC Sch
40
1 1/2-in.
3-ft.
38-mm
914-mm
2-in.
3-ft.
51-mm
914-mm
2 1/2-in.
3 1/2-ft.
64-mm
1067-mm
3-in.
3 1/2-ft.
76-mm
1067-mm
4-in.
4-ft.
17. Slope the vent and combustion air piping downward towards
furnace. A minimum slope of at least 1/4-in. (6 mm) per linear
ft.(1-in (25 mm) per 4 ft.(1.2 M)) with no sags between hangers is
required. See Caution Box below.
FURNACE RELIABILITY HAZARD
Failure to follow this caution may result in nuisance short cycling,
frozen vent termination, and/or no heat.
Slope the vent and combustion air piping downward towards furnace a
minimum of 1/4-in. (6 mm) per linear ft. of pipe.
18. Complete the vent and combustion air pipe installation by
connecting the concentric vent or by installing the required
termination elbows as shown in
For Ventilated Combustion Air Termination, See
19. Use appropriate methods to seal openings where combustion air
pipe and vent pipe pass through roof or sidewall.
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
DO NOT use cement to join polypropylene venting systems. Follow
SEE
the polypropylene venting system manufacturer's instructions for
installing polypropylene venting systems.
Optional Installation of the Vent Pipe
NOTE: DO NOT USE THIS TECHNIQUE FOR POLYPROPYLENE
VENTING SYSTEMS.
This option provides a disconnect point for the vent pipe. The vent pipe
must be cemented to the plastic vent pipe adapter to maintain a sealed
vestibule. See
Fig.
58.
VENT PIPE ADAPTER WITH GASKET
INSTALLED ON FURNACE. VENT
PIPE IS CUT FLUSH WITH TOP OF
ADAPTER. PRIME AND CEMENT VENT
PIPE TO ADAPTER. ALLOW TO DRY
BEFORE INSTALLING VENT COUPLING.
VENT PIPE FLUSH WITH ADAPTER
Fig. 58 – Optional Vent Pipe Flush with Adapter
1. Insert a length of vent pipe through the casing into the outlet of the
vent elbow.
44
Table 16 – Hanger Spacing
Material
SDR 21 &
ABS
CPVC
26
2 1/2-ft.
3-ft.
3-ft.
762-mm
914-mm
914-mm
3-ft.
3-ft.
3-ft.
914-mm
914-mm
914-mm
3-ft.
3 1/2-ft.
3 1/2-ft.
914-mm
1067-mm
1067-mm
3-ft.
3 1/2-ft.
3 1/2-ft.
914-mm
1067-mm
1067-mm
3 1/2-ft.
4-ft.
4-ft.
CAUTION
!
Fig.
39,
Fig. 40
WARNING
!
VENT PIPE FLUSH SHOWING COUPLING
Polypro-
pylene
3.25-ft.
1000 mm
3.25-ft.
1000 mm
3.25-ft.
1000 mm
3.25-ft.
1000 mm
3.25-ft.
and
Fig.
48.
Fig.
45.
ALIGN NOTCHES IN VENT PIPE
COUPLING OVER STAND-OFF
ON ADAPTER. TORQUE LOWER
CLAMP 15 LB-IN. WHEN REMAINING
VENT PIPE IS INSTALLED, TORQUE
UPPER CLAMP TO 15 LB-IN.
A13076

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents