Preparing The Appliance; Setting Up The Appliance - DeLonghi EC9335.M Manual

Hide thumbs Also See for EC9335.M:
Table of Contents

Advertisement

B6. Hot water button
B7.
button: to customise beverage quantity
B8. Mode selector dial:
• Espresso
• Americano
• Coffee
• Descaling
B9. Descale light
B10. Steam ready light
B11. Overtemperature light
B12. Energy saving light
B13. General alarm light
B14. Beans container empty/No beans container light
B15. No water light
B16. Pressing light
B17. Pressure gauge
1.3 Description of the accessories
(page 3 - C )
C1. Filter holder
C2. Easy Clean filter 1 coffee
C3. Easy Clean filter 2 coffee
C4. "Total Hardness Test" indicator paper
C5. Descaler
C6. Water softener filter (*if present)
C7. Power cord
C8. Tube brush
C9. Milk jug

2. PREPARING THE APPLIANCE

Wash all accessories with warm water and washing-up liquid,
then proceed as follows:
1. Insert the beans container (A2) in the coffee mill (fig. 1).
The container is correctly inserted when the arrow is lined
up with the
symbol and you hear a "click";
2. Insert the drip tray (A13) complete with cup grill (A11) and
drip tray grille (A12) (fig. 2);
3. Extract the water tank (A17) (fig. 3) and fill with fresh clean
water, taking care not to exceed the MAX level (fig. 4).
4. Put the tank back in the appliance.
Important: Never operate the appliance without water in the tank or without the
tank.
Please note: You should customise water hardness as soon as possible following the
instructions in section "12.2 Water hardness".

3. SETTING UP THE APPLIANCE

1. Plug the power cord connector (C7) into the socket (A19) at
the back of the appliance (fig. 5), then plug the plug into
the mains socket. Make sure the main switch (A20) at the
back of the appliance is pressed and in the I position (fig.
6);
2. The
light corresponding to the button (B6) comes on
and the
light (B15) flashes to indicate that you need to
deliver water to fill the circuit (fig. 7);
3. Place a container with a minimum capacity of 100 ml under
the hot water spout (A5) and cappuccino maker (A8) (fig.
8);
4. Press the button (B6) corresponding to the
9). Delivery begins and stops automatically. Empty the
container.
Before using the machine, you must rinse the internal circuits.
Proceed as follows:
5. Attach the filter holder (C1) complete with filter to the ap-
pliance. To attach correctly, align the filter holder handle
with
(fig. 10), then turn the handle to the right until it
is aligned in the position;
6. Place a recipient under the filter holder and cappuccino
maker (A8) (fig. 11);
7. Press the button (B4) corresponding to the
livery begins (fig. 12);
8. When delivery is complete, turn the steam dial (A4) (fig.
13) and deliver steam for 10 seconds to rinse the steam
circuit;
9. Repeat points 7 and 8 until you have delivered at least 1
litre of water (about half the tank);
10. Extract the water tank (A17) (fig. 3), rinse and fill with fresh
clean water, taking care not to exceed the MAX level (fig. 4).
The appliance is ready for use.
Please note:
We also recommend rinsing the internal circuits if the appliance is
not used for a long period.
The first time you use the appliance, you need to make 4-5 cups
of coffee before the appliance starts to give satisfactory results.
Pay particular attention to the quantity of pre-ground coffee in
the filter ((C2) or (C3)) (see instructions in section "4.5 Adjusting
the quantity of ground coffee in the filter").
Proceed as described in section "4. Prepare the perfect dose".
4. PREPARE THE PERFECT DOSE
4.1 Preparing the coffee mill
1. Make sure the beans container is correctly inserted and
lined up to position "3" (fig. 14) (default setting) ;
2. Remove the beans container lid (A1);
3. Place the required quantity of coffee beans in the container
(fig. 15);
4. Close the lid, pressing firmly.
5. The first time you use the appliance, make sure the dial (B2)
is in the
position (default setting).
4.2 Select the grinding level
The grinding level affects delivery speed and therefore the qual-
ity of the extract.
29
light (fig.
light. De-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents