Follett C33984 Operation And Service Manual page 20

Table of Contents

Advertisement

3. Press new mating ring into main housing as shown.
4. Lube the shaft with liquid soap in the area shown and
slip on seal and spring.
Note: Do not touch the sealing surfaces. Use cardboard disk to
install.
5. Reinstall main housing as shown.
6. Orient auger shaft with keyway in the upward position.
7.
Force main housing into position against evaporator and
place 1/4" (7 mm) diameter Phillips screwdriver into hole
in the auger shaft.
8. Replace V-band clamp as shown.
9. Replace nut on V-band clamp and tighten.
10. Remove screwdriver.
20
Fig. 19
Lube
with soap
Do not
touch
Fig. 20
Fig. 21
Note: Shuttle housing
removed for clarity
Horizon 1000R/N Ice Machines
Cardboard
disc

Advertisement

Table of Contents
loading

Table of Contents