PERMAQ ® Compact plant built PERMAQ ® tion and operation of the BWT together in order to take up a little Compact plant and PERMAQ ® Compact plant which space as possible.
(treated water) The raw water, which is to be in the reservoir does not overflow ® treated in the BWT PERMAQ Fit the ¾” flexible pressure hose when the tank is full. Compact plant, must be softened to the transport pump (B-Figure...
BWT PERMAQ ® Compact Figure 3). 98 % applies by 75 % recovery. Now switch on the 230 Volt 271-274 respectively, at a temp. Contact BWT the supplier of your of 10-25 °C. 50 Hz power supply. Also...
If e.g. the raw-water temp. is 8 pass valve again, otherwise you and hydrophore is preset to 2.7 °C, for an BWT PERMAQ ® Com- will get a mixture of permeate bar from our factory, so they do pact it means that the permeate and raw water on the outlet.
MAINTENANCE AND TROUBLE-SHOOTING Maintenance The BWT PERMAQ ® Compact plant is produced and designed for a minimum of servicing and maintenance. However, there are certain functions which should be checked regularly. Maintenance intervals should be per- formed once a week – read section 13.5 Operating Journal.
Troubleshooting This section deals with the problems that may arise on the plant. 9.2.1 The plant capacity has dropped 9.2.2 The quality of the treated water is higher than 20 µS/cm...
9.2.10 Survey of Alarm Conditions LED function: In normal operation the LED’s are lit corresponding to the components they represent. “Re-start ALARM” on TP-pump: (Nothing is working - permanent Section 9.2.8 condition) ALARM - Too high water level: (Nothing is working - permanent Section 9.2.6 condition) Restore raw water pres-...
It is possible to adjust the various time settings for Start, Stop and Alarm, plus insert a start-up delay of the pump. Use of DIP-switch: No. 1 High-pressure pump No. 2 Transport pump ® No. 3 Selection of BWT PERMAQ Compact model No. 4-6 Transport pump 10. TECHNICAL SPECIFICATION 10.1 Technical Specifications ® BWT PERMAQ Compact...
25 litres, or order special clogged due to belated clean- The water is pressed through the ® CIP tank for BWT PERMAQ ing, it is recommended to per- RO membrane by means of a Compact 271-274 from BWT form the cleaning procedure high-pressure pump.
If, after this cleaning, the ca- been refitted with the U-lock 4. Plant operating pres- pacity of the membranes is still inserted, remount all hoses. sure (E-Figure 3) not satisfactory, the membranes Note! When the hose connec- 5. Raw water temperature must be discarded and new tion is pushed into the stainless 6.
NO, the problem does not concerns the plant or the installation The plant - we mean only the part of the whole installation which was delivered by BWT (i.e only the plant). The installation - we mean the piping etc. leading to the plant.
13.5 Operating Journal Maintenance intervals should be performed once a week. Replacement frequency of wearing parts shown in ® section 13.6 Spare Parts List BWT PERMAQ Compact 271-274.
Need help?