Samsung MXJ-YA1509 Series Installation Manual page 70

Table of Contents

Advertisement

   
3. 3.
   
Guideline for each installation process
Guideline for each installation process
4-8. Nitrogen Pressurization Test
4-8. Nitrogen Pressurization Test
1) Leakage test
1) Leakage test
Perform individual finishing of the liquid/gas pipe or connect the liquid/gas pipes for pinching and
Perform individual finishing of the liquid/gas pipe or connect the liquid/gas pipes for pinching and
brazing.
brazing.
Nitrogen pressurization, 4MPa
Nitrogen pressurization, 4MPa
Maintains 4Mpa for 24 hours. If no leakage, then pressure down to 1MPa.
Maintains 4Mpa for 24 hours. If no leakage, then pressure
Maintain 1Mpa until connecting the outdoor/indoor units. Prevent corrosion in the copper pipes.
Maintain 1Mpa until connecting the outdoor/indoor units. Prevent corrosion in the c
No change
No
change in in the
the gauge
gauge for
for 24
24 hours
Maintain a pressure of 10kgf/cm
Maintain a pressure of 10kgf/cm
69
69
 Air tightness test
 Air tightness test
hours
41kgf/cm
41kgf/cm
down to 1MPa.
2 2
 (1Mpa)
 (1Mpa)
2 2
(4.1Mpa)pressure maintained
(4.1Mpa)pressure maintained
opper pipes.
   
   