2. 2.
Preparation for installation
Preparation
for installation
Problem analysis
Problem analysis
After purchasing the pipe, it was not kept properly so
After purchasing the pipe, it was not kept properly so
dust, foreign substances, water and industrial water got
dust, foreign substances, water and industrial water got
inside of the pipe. Also p
inside of the pipe. Also pipe was left on the ground and
people just walked on them.
people just walked on them.
Consequence
Consequence
Water or foreign substances within the pipe will cause
Water or foreign substances within the pipe will cause
blockage that can lead to product malfunction or
blockage that can lead to product malfunction or
performance decrease.
performance decrease.
Standard procedure
Standard procedure
When storing the pipe, use c
When storing the pipe, use cover or tape to block the
entrance and do not leave them on the ground but keep
entrance and do not leave
them on the supporting structure with at least 30mm in
them on the supporting structure with at least
height.
height.
Proper method
Proper method
Strictly follow the standards.
Strictly follow the standards.
42
42
ipe was left on the ground and
over or tape to block the
them on the ground but keep
30mm in