2.2 Mechanical Installation

®
It is recommended that the
2N LiftGate
main unit is installed in a room secured
against unauthorized persons, such as the machine room, substation, etc. If the unit is
installed on an easily accessible place, the Internet access or SIM cards can be
misused.
®
Mount the
2N LiftGate
main unit on a wall using the provided dowels and screws. We
recommend that the main unit should be installed in a maximum height of 2 meters.
Drill 2 holes spaced apart 176 mm (6.9 inches) and insert the dowels. Put the screws
through the device box metal profile holes and tighten them into the dowels in the
wall.