Commissioning, inspection, maintenance
Further details regarding the individual steps
Checking all connections on the heating water side for tightness
Danger
There is a risk of injury when
working on pressurised compo-
nents.
Only open the connections on the
heating water side after the boiler
has been depressurised.
Only drain the boiler with a suc-
tion pump when the boiler air vent
valve is open.
Cleaning and reconnecting the condensate drain system
Note
Clean the inside of the condensate drain
system at least annually.
36
(cont.)
Note
Also check the connections to control
equipment and to the minimum pressure
switch (low water indicator) for tight-
ness.
B
A
1. Undo four screws and remove the
rear centre and lower back panels.
C
D