9-Hydraulic Connection - MCZ AKI Hydromatic 16 M1 Installation Manual

Hide thumbs Also See for AKI Hydromatic 16 M1:
Table of Contents

Advertisement

9-HYDRAULIC CONNECTION

PLUMBING SYSTEM CONNECTION
IMPORTANT!
The connection of the stove to the plumbing system must be carried out ONLY by specialised personnel who are
capable of carrying out installation properly in compliance with current standards in the country of installation.
The manufacturer will not be held responsible for damage to persons or property in the event of failed operation if
the aforementioned warning is not complied with.
CONNECTION DIAGRAM
A1
Heating water supply 3/4"M
A2
Heating water return 3/4"M
A3
System filling 1/2"
A4
System outlet 1/4"M (see image on next page)
S=1/4"
A4
M=3/4"
A1
R=3/4"
A2
C=1/2"
A3
IMPORTANT!!!
CLEAN THE ENTIRE SYSTEM BEFORE CONNECTING THE STOVE, IN ORDER TO REMOVE ALL RESIDUE AND DEPOSITS.
Always install shutters in the system leading to the stove so as to disconnect it from the hydraulic system should it be
necessary to move it, or when it requires routine and/or special maintenance.
Connect the stove using flexible pipes so that the stove is not excessively constrained to the system, and to allow
slight movements.
40
185,5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aki hydromatic 24 m1

Table of Contents