Cladding Assembly - MCZ AKI Hydromatic 16 M1 Installation Manual

Hide thumbs Also See for AKI Hydromatic 16 M1:
Table of Contents

Advertisement

6 CLADDING ASSEMBLY

Live electrical parts: only power the product once it has been fully assembled.
On delivery, the stove has no ceramic and/or metal cladding, as shown in the image below.
Take the box with the ceramic sides "B" or metal sides "A" and prepare them for installation. The ceramic sides are already completely
assembled (ceramics and mounting brackets), as well as the metal sides, and must be fitted as per the instructions on the following pages.
B
Technical Dept. - All rights reserved - Reproduction prohibited
A
The claddings are delicate, therefore handle
with care.
METAL CLADDING "A"
POS.
DESCRIPTION
A
METAL SIDE
B
M4X12 SCREW
M5 NOTCHED WASHER
CERAMIC CLADDING "B"
POS.
DESCRIPTION
B
CERAMIC SIDE PANEL
M4X12 SCREW
M5 NOTCHED WASHER
A
No.
2
4
4
No.
2
4
4
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aki hydromatic 24 m1

Table of Contents