Boiler Fixing; Firing Rate - Riello GS5 Installation, Use And Maintenance Instructions

Forced draught gas burner
Table of Contents

Advertisement

BOILER FIXING

Separate the combustion head from the burner body
by removing the nut (1) and pulling back the group (A).
Fix the group (B) to the boiler plate (2), inserting the
supplied insulating gasket (3).
A

FIRING RATE

1.0
0.8
0.6
0.4
0.2
0
16
20
15,000
20,000
TEST BOILER
The firing rate has been defined according to EN 676 standard.
COMMERCIAL BOILERS
The burner-boiler matching is assured if the boiler conforms to EN 303 and the combustion chamber
dimensions are similar to those shown in the diagram EN 676.
For applications where the boiler does not conform to EN 303, or where the combustion chamber is
much smaller than the dimensions given in EN 676, please consult the manufacturers.
1
3
D5067
B
30
30,000
HINGE ASSEMBLY
2
40
50
40,000
3
GB
D5135
60
kW
50,000
kcal/h
Thermal power
S7392
20013751