STRIPE TAPE* 190.95.90.90 EMERGENCY EYE & SHOWER SAFETY SIGN 190.92.22.20 BOWL 190.91.22.12 FOOT TREADLE 190.91.80.33 TEST TAG L-STRAINER* SS DUST COVER ASSEMBLY* (OPTIONAL) * spare parts will require special order or may not be available (contact Galvin engineering for more details).
Version 3.1, 13 Aug. 2021, Page 3 of 7 INSTALLATION PROCEDURE Refer to Installation Drawing for clarification. Check parts list to ensure all required parts are included. Use an AS 4020 approved pipe joint sealant on all connections. STEP 1: Prepare the emergency shower foundation by using the floor flange as a template.
Version 3.1, 13 Aug. 2021, Page 6 of 7 TROUBLESHOOTING PROBLEM REPAIR CHECKLIST 1. No Flow. Check the main shut-off valve. Verify minimum 210 kPa flowing supply 2. Insufficient water flow. line pressure. 3. a. Verify minimum 210 kPa flowing supply line pressure b.
April 2021, Page 7 of 7 The warranty set forth herein is given expressly and is the only warranty given by the Galvin Engineering Pty Ltd. With respect to the product, Galvin Engineering Pty Ltd makes no other warranties, express or implied.