Rev. D, November 2020
c. Place two of the 1/2" X 6" material pieces, each folded in half, between the Nip
Rollers (1) (see Figure 3). This procedure simulates two layers of material between
the Rollers. Be sure these pieces do not extend past the Nip Rollers into the welder.
Rotate the Nip Pressure Cam (2) (see Figure 3) to the corresponding mil thickness
position indicated on the side of the Pressure Cam by rotating the Nip Pressure Cam
Lever (3) (see Figure 3) clockwise.
3
Pro-Wedge 3XL Operator's Manual
Figure 3
2
1
Page 12