4.
Increase the injected current and note the value at which the studied step of the function trip.
5.
Decrease the current slowly and note the reset value.
6.
Block lower set steps when testing higher set steps according to the instructions that follow.
7.
Connect a trip output contact to a timer.
8.
Set the injected current to 200% of the trip level of the tested step, switch on the current and check
the time delay.
For inverse time curves, check the trip time at a current equal to 110% of the trip current in order to
test parameter txmin.
9.
Check that all trip and pickup contacts trip according to the configuration (signal matrixes)
10.
Reverse the direction of the injected current and check that the step does not trip.
11.
Check that the protection does not trip when the polarizing voltage is zero.
12.
Repeat the above-described tests for the higher set steps.
13.
Finally, check that pickup and trip information is stored in the event menu.
11.4.5.2

Completing the test

Continue to test another function or end the test by changing the TESTMODE setting to Disabled.
Restore connections and settings to the original values, if changed for testing purposes.
11.4.6
Sensitive directional residual overcurrent and power protection
SDEPSDE (67N)
Prepare the IED for verification of settings as outlined in section
for test"
in this chapter.
IED test set
ANSI09000021 V1 EN-US
Figure 23:
Values of the logical signals belonging to the sensitive directional residual overcurrent and power
protection are available on the local HMI under Main menu /Test /Function status /Current
protection /SensDirResOvCurr(67N,IN>) /SDEPSDE(67N,IN>):x
Bay control REC670
Commissioning manual
NI
V_A
V_B
V_C
V_N
Principle connection of the test set
© 2017 - 2021 Hitachi Power Grids. All rights reserved
"Requirements"
IED
NI
V1
V2
V3
V_N
TRIP
ANSI09000021-1-en.vsd
Section 11
Testing functionality by secondary injection
SEMOD53296-122 v5
SEMOD175060-3 v7
and section
"Preparing
97

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents