Section 8
Establishing connection and verifying the IEC 61850 communication
that other signal is shown as Ok. Be sure to re-connect the removed connection after completed
verification.
60
© 2017 - 2021 Hitachi Power Grids. All rights reserved
1MRK 511 403-UUS Rev. K
Bay control REC670
Commissioning manual