Manual Regeneration - Hitachi ZW 550-6 Operator's Manual

Wheel loader
Table of Contents

Advertisement

Manual Regeneration

When the deposit level increases to a level that is more
than an auto-regeneration can remove, a manual
regeneration is required.
The yellow regeneration symbol (shown below)(1) and
service indicator (2) appear to make the operator aware
that this is required.
This symbol indicates that the
aftertreatment device manual regeneration
is required.
Perform manual regeneration (Refer to page
(Blinking,
5-13 for the procedure.)
Yellow)
This symbol indicates that the
aftertreatment device regeneration is
inhibited.
It is displayed when the manual
regeneration is requested while
(Lighting,
regeneration "inhibited" feature has been
Yellow)
applied.
Move the machine to a safe place.
Perform manual regeneration by pressing
manual regeneration switch (3).
(Refer to page 1-57 for more information.)
The manual regeneration must be performed as soon
as possible, and it will take the loader out of service for
about 10~20 minutes.
Refer to page 5-13 for the manual regeneration
procedure.
f
NOTE: When the manual regeneration starts, regeneration
indicator (4) turns ON. If it does not appear when pressing
switch (3), the manual regeneration is not activated.
Contact your authorized dealer for repair.
The engine trouble alarm (in yellow) may
occur if the machine is being operated
without performing a manual regeneration.
It may be necessary to clean, repair or
replace the aftertreatment device after
(Lighting,
removing the device depending on its
Yellow)
condition.
Immediately set the machine in the park
position, apply parking brake, stop the
engine and consult your authorized dealer.
OPERATOR'S STATION
1
2
1
2
1-36
Basic Screen
(Rear View Camera Sight)
Basic Screen
(Operating Rear View Monitor)
3
4
MNHG-01-280EN
MNHG-01-281EN
115MNEC-07-01
MNHG-01-100EN

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents