Preparing The System For Operation - IBM 5105-22E Manual

Hide thumbs Also See for 5105-22E:
Table of Contents

Advertisement

Figure 12. Replacing the control panel onto the bracket
Preparing the 5105-22E, 9008-22L, 9009-22A, 9009-22G, or 9223-22H system for
operation after removing and replacing the control panel
To prepare the system for operation after removing and replacing a control panel, complete the steps in
this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Slide the service access cover (A) onto the system unit.
3. Close the release latch (B) by pushing it in the direction shown.
14 Power Systems: Power Systems: Control panel

Advertisement

Table of Contents
loading

This manual is also suitable for:

9008-22l9009-22a9009-22g9223-22h

Table of Contents