Before Operation; Overview: Before Operation; To Fix The User Interface To The Wall; To Insert The Batteries - Daikin FTXTA30A2V1BW User Reference Manual

Hide thumbs Also See for FTXTA30A2V1BW:
Table of Contents

Advertisement

4
|

Before operation

4 Before operation

4.1 Overview: Before operation

4.2 To fix the user interface to the wall

4.3 To insert the batteries

User reference guide
14
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
Fixing the user interface to the wall.
Inserting the batteries in the user interface.
Setting the brightness of the user interface display.
Setting the clock.
Setting the indoor unit position.
Turning on the power supply.
a
b
c
a
User interface
b
Screws (field supply)
c
User interface holder
1 Choose a place where the signals reach the unit.
2 Attach the holder with screws to the wall or a similar location.
3 Hang the user interface on the user interface holder.
The batteries will last for about 1 year.
1 Remove the front cover.
2 Insert both batteries at once.
3 Put back the front cover.
FTXTA30A2V1BW
Split system air conditioner
4P518786-4F – 2020.05

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents