5 – FUNCTIONING AND USE

5.3.1 Preliminary checks before proceeding with the startup procedure

Please, be sure to perform all the following checks before proceeding with the startup procedure:
1. Verify that all plant components are connected correctly.
2. Verify the 5 micron is installed correctly.
3. Be sure the seawater inlet valve and salt water drain valve are opened (If existing).
4. Be sure the reset valve is closed (lever orthogonal to the body valve) and the positioner completely
unscrewed.
5. Be sure the fresh water pressurizing pump of the boat is on.
6. Be sure the valve on the active carbon filter is opened.
7. Be sure the fresh water tank is full enough (at least 200lt) to perform washing procedure.

5.3.2 Start up

1. Open the depressurization valve (lever horizontal)
2. Push for 20-30 sec the red button on the active
carbon filter housing cup in order to purger the air
from the system.
3. Activate the start up procedure throw the function
of the MENU (select the specific function in the menu
mode, exit from menu mode pushing STOP, and start
the procedure pushing START).
4. Close the depressurization valve when the display
shows the specific message and wait for
completion of the procedure.
The procedure lasts about 3 minutes, and it can anyway be stopped anytime pushing STOP. After completed
the procedure the system is ready to start normally.