6 – MAINTENANCE (ROUTINE AND EXTRAORDINARY)
6.5.2
Shutdown operating procedure
1. Disconnect the production pipe and collect about
20 liters of fresh water within a tank.
2. Switch off the system by pushing the stop button.
3. Prepare the solution carefully mixing the bottle of
SC1 in about 20 liters of unchlorinated water.
4. Connect the 3 hoses to the pre-pump and
watermaker as indicated above, and dip them in
the solution.
THE PRESENT MANUAL BELONGS TO -
Schenker Italia
- ALL RIGHTS RESERVED
44
COD.
100S12/24.D.2018
EN