GE PV977 Owner’s Manual And Installation Instruction page 17

Island chimney vent hoods
Table of Contents

Advertisement

Available languages

Available languages

1 MOUNT TEMPLATE
• Align the template with the marks on the ceiling and
tape in place.
– Be sure the template is oriented correctly
with the front of the hood.
• Use a plumb bob to be sure the mounting holes
will provide parallel alignment with the countertop
below.
• Determine wire access hole location.
• Center punch all screw and determined wire hole
locations.
• Drill pilot holes in the 4 screw locations. Use a 3/16"
bit and drill approximately 1-1/2" deep.
• Drill one 1/2" hole for wires.
• Cut the 8-1/2" duct opening through the ceiling.
2
INSTALL CEILING SUPPORT
• Using 4 wood screws provided, attach the ceiling
support to the ceiling over duct opening hole
using pilot holes drilled in step 1.
49-2000833 Rev. 0
Installation Preparation
Front
Screws
Cut one 1/2" Dia.
Wire Access Hole
as Needed
36" HOOD
8-1/4" To
TEMPLATE
Centerline of
Pilot Holes
Cut one 1/2" Dia.
Wire Access Hole
10-5/16" To
as Needed
Centerline of
Pilot Holes
FRONT OF HOOD
3 INSTALL LOWER HORIZONTAL
SUPPORTS TO HOOD ASSEMBLY
• Install the lower horizontal support to 4 lower vertical
supports with 8 - 4.2x8 mm screws.
A
B
C
A. Lower horizontal support
B. 8 - 4.2x8 mm screws
C. 4 - Lower vertical supports
Drill 3/16" Pilot Holes
Approx. 1-1/2" Deep
4 Places
10-5/16" To
Centerline of
Cut one 1/2" Dia.
Pilot Holes
Wire Access Hole
as Needed
8-1/4" To
Centerline of
Pilot Holes
Cut one 1/2" Dia.
Wire Access Hole
as Needed
31-14772
Printed in Mexico 12-08 JR
17

Advertisement

Chapters

Table of Contents
loading

Table of Contents