GE PV977 Owner’s Manual And Installation Instruction page 12

Island chimney vent hoods
Table of Contents

Advertisement

Available languages

Available languages

CHECK INSTALLATION HARDWARE
Locate the hardware package packed with the hood and check contents.
HARDWARE PACKAGE
Locate and count screws
4 Duct cover clips
73 Hood attachment screws
2 Leveling screws
Cut one 1/2" Dia.
Wire Access Hole
as Needed
8-1/4" To
Centerline of
Pilot Holes
Cut one 1/2" Dia.
Wire Access Hole
as Needed
RECIRCULATING KIT (Included)
Air deflector
12
Installation Preparation
4 Wood
screws
(70 required, 3 extra)
Drill 3/16" Pilot Holes
Approx. 1-1/2" Deep
4 Places
10-5/16" To
Centerline of
Cut one 1/2" Dia.
Pilot Holes
Wire Access Hole
as Needed
36" HOOD
TEMPLATE
8-1/4" To
Centerline of
Pilot Holes
Cut one 1/2" Dia.
Wire Access Hole
10-5/16" To
as Needed
Centerline of
Pilot Holes
FRONT OF HOOD
31-14772
Printed in Mexico 12-08 JR
Template
D
C
A
E
C
B
Stainless steel filter
Upper
Duct covers
Charcoal filter
A
Upper vertical supports (4)
B
Lower vertical supports (4)
Duct cover supports (2)
D
Ceiling support
E
Horizontal support
Lower
49-2000833 Rev. 0

Advertisement

Chapters

Table of Contents
loading

Table of Contents