Assembly Of A Boiler Block From Sections; Joining The Boiler Block Assembly (Delivery Unassembled) - Buderus Logano G315 Installation And Service Instructions Manual

Boilers for oil/gas-fired power burners
Table of Contents

Advertisement

7.1

Assembly of a boiler block from sections

WARNING: Risk of injury from inadequately secured
boiler sections.
▶ Secure boiler sections during assembly and take
measures to prevent them from tipping over. If a
hoisting tool is available, this can be used to set up
the boiler sections safely.
The boiler block is always installed starting from the rear with the rear
section (Fig. 7, [4]) and working towards the front. The front section
(Fig. 7, [10]) is always fitted last.
Observe the directional arrows (Fig. 7, [9]) during assembly and carry
this out in accordance with the following instructions and illustrations.
Fig. 8
Rear section
7.2
Joining the boiler block assembly
(delivery unassembled)
Remove nuts and washers from the studs on the hubs of the boiler
sections before attaching the rear section and front section.
▶ Set up the rear section and secure it against tipping.
▶ File down any burrs on the hubs ( Fig. 9).
Fig. 9
Remove burrs
Logano G315 – 6 720 817 939 (2017/02)
▶ Clean the packing grooves where required using a wire brush and
cloth (Fig. 10, [3]).
▶ Clean the hub sealing faces (Fig. 10, [1 and 2]) with a rag soaked in
solvents or gasoline.
▶ Evenly coat the hub sealing faces with sealant.
3
720 42 21-04.1o
Fig. 10 Preparing the packing grooves and hubs
The next step involves preparing the nipples that will eventually seal the
boiler sections.
▶ Clean nipple with a rag soaked in solvents or gasoline and coat evenly
with sealant.
▶ Insert the nipple straight into the upper (Sz. 2,119/50) and lower
(Sz. 0, 57/50) hub of the rear section and hammer home securely
with alternate heavy blows. The upper nipple (Fig. 11, [1]) and the
lower nipple (Fig. 11, [2]) should protrude approx. 28 mm out of the
corresponding hub once they have been driven in.
▶ Remove any burrs with a file.
720 42 21-05.1o
Boiler block assembly
WARNING: Health hazard from noxious vapors released
from material handling, such as solvents, primers or
sealant.
▶ Ensure adequate ventilation of the installation area.
▶ Please note the handling and safety instructions of
the product used.
2
7
1
720 42 21-0 .1o
13

Advertisement

Table of Contents
loading

Table of Contents