9.3.4 To connect the electricity meters

ERLA11~16DAV3+W1 + EBVH16SU23DJ
Daikin Altherma 3 R F
4P655196-1 – 2021.09
[2.D] Shut off valve
1 Open the following (see
1 Top panel
2 User interface panel
3 Upper switch box cover
2 Connect the valve control cable to the appropriate terminals as shown in the
illustration below.
NOTICE
Wiring is different for a NC (normally closed) valve and a NO (normally open) valve.
A
B
A
B
B
3 Fix the cable with cable ties to the cable tie mountings.
Wires: 2 (per meter)×0.75 mm²
Electricity meters: 12 V DC pulse detection (voltage supplied by PCB)
[9.A] Energy metering
"7.2.4 To open the indoor
M2S
NO
21 28
X2M
NC
21 29
X2M
9
Electrical installation
|
4
unit" [
 79]):
1
Installer reference guide
3
2
133