Frame Heater - Porkka Future Installation And Operation Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 18
"P1"
Thermostat probe failure*
"P2"
Evaporator probe failure*
(not in chiller cabinets C)
"P3"
Condenser probe failure*
"P4"
Extra probe failure*
*Note! The cabinet operates on its standby
system and will hold normal temperature, but
reset the alarm signal and immediately contact
your service provider.
"EE"
Data failure*
In case of an "EE" alarm reset the alarm and
restart the equipment by pushing any key for 3
seconds until the code "rSt" is displayed.

FRAME HEATER

The door frame of the cabinet is heated to prevent the gasket
from freezing. The heater operates fully automatically.
The ice that may appear on the surface of the evaporator must
not be removed with any sharp instrument!
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Future plus

Table of Contents