Advertisement

Quick Links

BE8140
BRINKMANN-Horizontal End Suction Pumps
SBA141...143, SBF125
Brinkmann Pumpen
K. H. Brinkmann GmbH & Co. KG
Friedrichstraße 2
D-58791 Werdohl
Tel.: +49-2392 / 5006-0
Fax.: +49-2392 / 5006-180
Subject to change without prior notice.
© Brinkmann Pumpen
Operating Instructions
(Translation of original)
10/2021
Edition
www.brinkmannpumps.de
sales@brinkmannpumps.de
Order - No. : BE8140 ENGLISH
1 of 10
Page

Advertisement

Table of Contents
loading

Summary of Contents for Brinkmann SBA141

  • Page 1 BE8140 Operating Instructions (Translation of original) BRINKMANN-Horizontal End Suction Pumps SBA141...143, SBF125 Brinkmann Pumpen K. H. Brinkmann GmbH & Co. KG Friedrichstraße 2 D-58791 Werdohl Tel.: +49-2392 / 5006-0 www.brinkmannpumps.de Fax.: +49-2392 / 5006-180 sales@brinkmannpumps.de Subject to change without prior notice.
  • Page 2: Table Of Contents

    Brinkmann–Horizontal End Suction Pumps Series SBA141...143, SBF125 Contents 9 Trouble shooter’s guide ........6 Indication to the manual ........2 Description of product ........2-3 10 Spare part ............7 Safety instructions .......... 3-4 11 Repair Instructions ........8-9 Transport and storage ........4 12 Disposal ............
  • Page 3: Safety Instructions

    / spec. dBA / 50 Type weight 1 l/min H mm h mm l mm SBA141 0.63 / 0.725 SBA142 1.1 / 1.27 SBA143 1.7 / 1.95 SBF125 28.5 0.63 / 0.725 1) Noise emissions measured in accordance with DIN 45635 at a distance of 1 m.
  • Page 4: Transport And Storage

    Safety instructions relevant for operation 5 Installation and Connection • If hot or cold machine components involve Mechanical installation hazards, they must be guarded against acci- The pumps must be properly fastened. The pipe- dental contact. work must be installed so that no distortion of the •...
  • Page 5: Start Up / Shut Down

    Electric wiring 6 Start up / Shut down Start up ATTENTION Switch off at the mains. All service work must be carried out by quali- After connection the electrical wires, close the fied service personnel. Pump must be discon- terminal box. Briefly start the motor (max. 30 sec.) nected from the power source and all rotating and check the rotation according to the arrow on parts must stand still.
  • Page 6: Servicing And Maintenance

    8 Servicing and Maintenance Pumps with double mechanical seal (-GD) Pumps with double mechanical seal (-GD) are ATTENTION identified by the letters GLRD stamped in on the motor side of the pump foot and must include an oil The surface of the motor must be kept free of dirt. receiver with a capacity of 0.24 litres.
  • Page 7: Spare Part

    10 Spare part 10.1 Spare part list for Brinkmann Horizontal End-Suction Pumps Series SBA141…143, SBF125 Item Description Item Description Stator with terminal board 30 Shaft seal Motor flange 31 Compensation disk 1.7 kW End shield 50 Pump body Terminal box...
  • Page 8: Repair Instructions

    (24a) from the 1. Pumptype pump body (50) and pump foot (12). Clean the e.g. SBA141 seat of the seal and the pump parts! 2. Pump No. The mechanical seal (24) should now be com- e.g.
  • Page 9: Disposal

    Mark the first screw and tighten all the screws evenly by hand, one after the other in a clock- wise direction (not cross-ways). − Tighten the shaft clamp ( 24 mm) for SBA141, SBA142 and SBF125 Use a torque screwdriver to tighten each screw first with 1.3 Nm then with 2.6 Nm and finally...
  • Page 10: Ec Declaration Of Conformity

    EC declaration of conformity / Déclaration de conformité CE / Declaración de conformidad CE Hersteller / Manufacturer / Constructeur / Fabricante Brinkmann Pumpen, K. H. Brinkmann GmbH & Co. KG Friedrichstraße 2, D-58791 Werdohl Produktbezeichnung / Product name / Désignation du produit / Designación del producto Blockpumpen / Horizontal End-Suction Pumps / Pompes horizontales monobloc / Bombas horizontales monobloc SBA141…143, SBF125...

This manual is also suitable for:

Sba142Sba143Sbf125

Table of Contents