Installation And Mounting - Emerson Dixell XB Series Installing And Operating Instructions

Blast chiller
Table of Contents

Advertisement

NOTE1: with dbH = yES a defrost is done before the holding phase.
NOTE2: If the end cycle temperature iS3 is not reached in the maximum time Pd1+Pd2+Pd3 the instrument
keep on working, but the alarm message "OCF" is given.

12. INSTALLATION AND MOUNTING

Instruments XB570L shall be mounted on vertical panel, in a 150x31 mm hole, and fixed using two screws
3 x 2mm. To obtain an IP65 protection grade use the front panel rubber gasket (mod. RG-L). The
temperature range allowed for correct operation is 0 to 60°C. Avoid places subject to strong vibrations,
corrosive gases, excessive dirt or humidity. The same recommendations apply to probes. Let the air
circulate by the cooling holes.
12.1 CUT OUT
12.2 MOUNTING
4
1592006207 XB570L GB r1.1 23.03.2015
Ø3 x2
1
2
3
+1
165
-1
+0.5
150
-0
3
2
4
XB570L
1
RG-LX gascke
(optional)
12/20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dixell xb570lDixell xb570l-5r0c1-x378254

Table of Contents