This chapter will describe the mechanical installation of the Liebert_DM chilled water series cooling unit in detail,
including unpacking inspection, unit installation and pipe installation.

2.1 Unpacking inspection

Move the equipment to the place closest to the final installation site before unpacking.
In case any loss or damage of any parts is discovered during inspection, the same shall be reported to the carrier
immediately. Concealed damages noted shall also be reported to the carrier and the local office of the goods supplier.
Please do not accept the damaged equipment.

2.2 Installation precaution

1. The Liebert_DM chilled water series cooling unit adopts standalone installation mode. The unit must be installed on
the ground of the equipment room or computer room.
2. Before installing the equipment, check if the installation environment meets the relevant requirements as specified in
1.5 Environmental Requirement. And check if the building needs to be reformed for the pipe laying, wiring and
ventilation pipe mounting.
3. Install the equipment strictly according to the design drawing, and reserve corresponding installation/maintenance
space. Please refer to the engineering dimensions provided by the manufacturer.

2.3 System installation layout

2.3.1

General layout

The general layout of the system is as shown in Fig.2-1.
Chilled water inlet
Chilled water inlet
Chilled water outlet
Chilled water outlet
Note
1.
: Pipeline provided by the manufacturer.
2.
: Pipeline laid onsite (by the technical staff)
3.*: These components are not provided by Emerson Network Power Co., Ltd, but they are recommended to be used
for the normal operation of the system and maintenance.
4. After finishing the installation, air discharge must be carried out before pouring water so as to ensure the heat
transfer effect of the heat exchanger.
5. In winter in the northern region, the air conditioning unit must be emptied of water to prevent frosting the heat
exchanger if it will be idle for a long time.

Chapter 2 Mechanical Installation

Holding valve or isolating valve *
Holding valve or isolating valve *
平衡阀或隔离阀*
平衡阀或隔离阀*
Water filter *
Water filter *
水过滤器*
水过滤器*
冷冻水进口
冷冻水进口
冷冻水出口
冷冻水出口
User Manual of Liebert_DM Chilled Water Series Cooling Unit
Chilled water
Chilled water
Isolating
Isolating
冷冻水进出
冷冻水进出
隔离阀*
隔离阀*
软接口*
软接口*
Soft joint *
Soft joint *
inlet/outlet
inlet/outlet
valve *
valve *
口螺纹连接
口螺纹连接
threaded joint
threaded joint
排水阀*
排水阀*
Water discharge valve *
Water discharge valve *
Fig.2-1 General layout diagram
Chapter 2 Mechanical Installation
Air discharge valve
Air discharge valve
放气阀
放气阀
换热器盘管
换热器盘管
Heat exchanger coil
Heat exchanger coil
水流量调节阀
水流量调节阀
Water flow regulating valve