Bolt To Floor Guide Introduction; Delivery And Installation Tips - Life Fitness Axiom Series Assembly Instructions Manual

Pectoral fly / rear deltoid
Hide thumbs Also See for Axiom Series:
Table of Contents

Advertisement

5. Bolt to Floor Guide
Introduction
Life Fitness Family of Brands designs its products to be stable when used as designed. Because strength training is
dynamic, we cannot predict how users will ultimately use the products in all circumstances. Therefore, Life Fitness
Family of Brands recommends that strength training equipment be secured to a solid, level surface to stabilize and
eliminate rocking or tipping over.
Each new unit shipped comes with a multi-language hangtag stating the importance of bolting the unit down as a
safety precaution.
It is the facility's responsibility to adhere to local and regional building codes.

Delivery and Installation Tips

All Anchors
• Fasteners must have minimum embedment in concrete floor, not including screed, regardless of wood/tile/rubber
over sub-floor. (See Anchor Types for maximum sub-floor thickness between unit and concrete to equipment foot
must be made of flooring or other material (i.e. no air gaps)).
• DO NOT reuse fasteners. Static and Dynamic anchors are designed for one-time use only.
• Factor in equipment's feet height when selecting fastener length.
• Factor in flooring thickness when selecting fastener length.
• It is also recommended to drill an additional 1/2" (12.7 mm) of depth beyond the length of the fastener being used
to ensure that debris does not block the entry of the anchor.
• Minimum concrete compressive strength: 3000 psi (20 N/mm2).
Anchoring
• All anchors must have a minimum embedment into concrete, regardless of wood/tile/rubber/screed over sub-floor.
• Dynamic anchors must have a minimum embedment depth in concrete to ensure maximum security and pull out
force. See Anchor Types for embedment depth minimums.
Building Codes
It is the facility's responsibility to adhere to local and regional building codes. Please verify with the customer to ensure
that they are aware of this.
Carpeting
If bolted down to carpet flooring, be sure to use a box cutter knife to cut the carpet threads around each foot. This will
help avoid the carpet threads from being wrapped around and pulled by the drill bit.
Competitor Product
The bolt down guidelines and procedures for Life Fitness products were determined by the company's Engineering
and Installation Development groups. These guidelines include which anchors to use and positioning of the anchors
are required for Life Fitness product.
• Life Fitness does not have that level of specification or engineering input for competitive product.
• Life Fitness installation teams are not permitted to anchor competitor equipment.
Drilling
It is also recommended to drill an additional 1/2" (12.7 mm) of depth beyond the length of the fastener being used to
ensure that debris does not block the entry of the anchor.
• This can be done by marking your drill bit with a piece of tape.
• While it is recommended that a vacuum be used to clean up debris, this will not account for all the debris that will
settle at the bottom of the drilled hole.
Page 31 of 34

Advertisement

Table of Contents
loading

This manual is also suitable for:

Op-fly

Table of Contents