L3 Communications ProTec AISA1000-10 Installation And Operation Manual page 101

Automatic identification system hardware
Table of Contents

Advertisement

ProTec AIS INSTALLATION CHECKLIST
Installation Tasks
1.
Transponder Installed
2.
IEC Cable Connected
3.
VHF Antenna Installed and Connected
4.
GPS Antenna Installed and Connected
Power Up and Configuration Tasks
1.
Transponder Powered Up
2.
MMSI Number Entered
3.
Navigational Status Entered
4.
IMO Number Entered
5.
Maximum Sailing Draft Entered
6.
Radio Callsign Entered
7.
Vessel Type Entered
8.
Vessel Name Entered
9.
Destination Entered (Optional)
10. POB Entered (Optional)
11. ETA Entered (Optional)
Antenna Configuration Tasks
1.
AIS Internal GPS Position Entered
2.
External GPS Antenna Position Entered
3.
Transponder Linkup to Ship's dGPS & GYRO Verified
4.
No Alarms Verified
165M0014-10
Page A–3
Aviation Recorders
Marine Systems
Completed
Date
(Yes / No)
Initial Issue
Dec. 01/06

Advertisement

Table of Contents
loading

Related Products for L3 Communications ProTec AISA1000-10

Table of Contents