Figure 16: Network Wiring Connections - Accton Technology Edge-Core ES4528V Installation Manual

28-port gigabit ethernet switch
Table of Contents

Advertisement

N
W
ETWORK
IRING
Today, the punch-down block is an integral part of many of the newer equipment
racks. It is actually part of the patch panel. Instructions for making connections
in the wiring closet with this type of equipment follows.
Attach one end of a patch cable to an available port on the switch, and the
1.
other end to the patch panel.
If not already in place, attach one end of a cable segment to the back of the
2.
patch panel where the punch-down block is located, and the other end to a
modular wall outlet.
Label the cables to simplify future troubleshooting. See
3.
Connection Records" on page

Figure 16: Network Wiring Connections

C
ONNECTIONS
52.
Switch
27
28
Patch Panel
– 47 –
| Making Network Connections
C
4
HAPTER
Equipment Rack
(side view)
Punch-Down Block
Twisted-Pair Devices
"Cable Labeling and
Wall

Advertisement

Table of Contents
loading

Table of Contents