5. Transport and start up

5.1 Transport and installation
The machine will be delivered in a closed crate.
For transport use a forklift or hand trolley. Make sure the
machine does not tip or fall off during transport.
The machine is designed to operate in closed rooms and
must have sufficient floor space to operate it and to have
access from all sides.
5.2 Assembly
If you notice transport damage while unpacking, notify
your supplier immediately. Do not operate the machine!
Dispose of the packing in an environmentally friendly
manner.
Clean all rust protected surfaces with petroleum, diesel
oil or a mild solvent.
Unbolt the lathe from the shipping crate bottom.
Fig 3
Move the tailstock to the tailstock end of the bed
Place 2 steel rods of sufficient strength into 2 holes of
lathe base.
Sling the lathe with properly rated straps ( Fig 4)
Move the saddle and tailstock to the tailstock end of
the bed and lock in place.
Caution:
The machine is heavy!
GH 2040 ZH
GH 2060 ZH
GH 2080 ZH
GH 2640 ZH
GH 2660 ZH
GH 2680 ZH
GH 26120 ZH
Use great care.
Assure the sufficient load capacity and proper
condition of your lifting devices.
Never step underneath suspended loads.
8
Fig 4
2750 kg
3000 kg
3250 kg
2750 kg
3145 kg
3870 kg
4250 kg