Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Frick Manuals
Industrial Equipment
Vyper 700
Installation operation & maintenance
Frick Vyper 700 Installation Operation & Maintenance page 3
Hide thumbs
1
Table Of Contents
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
page
of
76
Go
/
76
Contents
Table of Contents
Bookmarks
Table of Contents
Advertisement
Figure 1 - Vyper
Data Plate
....................................................... 5
™
Figure 2A - Vyper
™
Elementary Wiring Diagram
......................... 10
Figure 2B - Vyper
Elementary Wiring Diagram
......................... 11
™
Figure 3 - VSD Input Current Without Harmonic Filter
............... 13
Figure 4 - VSD Input Current With Harmonic Filter
.................... 13
Figure 5A - Harmonic Filter Elementary Wiring Diagram
........... 14
Figure 5B - Harmonic Filter Elementary Wiring Diagram
........... 15
Figure 6 - Vyper
Package Mounted on Frick RWF II 134
......... 17
™
™
Figure 7 - Vyper
Cabinet and Stand
......................................... 18
Figure 8 - Minimum Flow Rates - GLYCOL
................................ 20
Figure 9 - Minimum Flow Rates - WATER
.................................. 21
Figure 10 - Pressure Drop vs. Flow Rate
.................................... 21
™
Figure 11 - Vyper
P&I Diagram - Noneconomized
................... 22
™
Figure 12 - Vyper
P&I Diagram - Economized
......................... 22
Figure 13 - Ground Circuit
.......................................................... 26
™
Figure 14 - Vyper
Cabinet Power and Control Entry Locations
26
™
Figure 15 - Vyper
Input Power Terminal Connection Lugs
....... 27
Figure 16 - Insulation Stripped from Power Leads
..................... 27
Figure 17 - Fastening Power Leads
............................................ 27
Figure 18 - Ground Connection
.................................................. 27
™
Figure 19 - Vyper
Output Power Terminal Connection Lugs
.... 28
™
Figure 20 - Vyper
Starter, Motor, Blower, and Quantum Wiring
29
™
Figure 21 - Quantum
LX Communications Terminal Block
....... 29
Figure 22 - Analog Board Wiring
................................................ 30
Figure 23 - Temperature Control Valve Wiring
............................ 30
Figure 24 - Thermistor Motor Protection Wiring
.......................... 31
Figure 25 - RTD Motor Protection Wiring
................................... 31
Figure 26 - Coolant Circulation System
...................................... 34
Figure 27 - Removing the Cooling System Pipe Plug
................ 34
Figure 28 - Hose connected to the Heat Exchanger Drain
........ 34
Figure 29 - Draining Coolant
..................................................... 34
Figure 30 - Refilling the Cooling System
.................................... 35
Figure 31 - VSD Logic Board Connection J2
.............................. 35
Figure 32 - Topping Off the Coolant Supply
................................ 35
Figure 33 - Installing the Cooling System Pipe Plug
.................. 35
Figure 34 - VSD Logic Board Connection J2
.............................. 35
Figure 35 - Quantum
LX Operating Status Screen
.................... 37
™
Figure 36 - Quantum
™
LX Session Screen
.................................. 38
Table 1 - Supply Voltage Requirements
..................................... 16
Table 2 - Operating Voltage Limits
............................................. 16
Table 3 - Power Interruption Minimum Voltage Limits
................ 16
Table 4 - Unit Current Limits
...................................................... 16
Table 5 - Circuit Breaker Ratings and Lug Sizes
....................... 16
Table 6 - Ambient Temperature Operating Limits
. ...................... 19
™
Table 7 - Vyper
Cabinet Component Temperature Thresholds
19
Table 8 - Entering Coolant Temperature Limits
. ......................... 20
Table 9 - Digital Control Signal Wire Recommendations
........... 24
Table 10 - Recommended Transformer Sizes
............................ 24
VYPER
VARIABLE SPEED DRIVE
™
INSTALLATION - OPERATION - MAINTENANCE
lisT of figures
lisT of Tables
Figure 37 - Quantum
LX Operating Status Screen
.................... 38
™
Figure 38 - Quantum
™
LX Compressor Configuration Screen
..... 39
Figure 39 - Communications Screen
.......................................... 40
Figure 40 - PID Setup Screen
(Page 2) ...................................... 41
Figure 41 - Operating Values Menu
............................................ 42
Figure 42 - Pull-down for Vyper Screen
...................................... 42
Figure 43 - Vyper™ Screen
........................................................ 43
Figure 44 - Harmonic Filter Screen
............................................ 44
Figure 45 - Low Motor Amps
...................................................... 45
Figure 46 - Motor Screen
............................................................ 45
Figure 47 - High Motor Amps
..................................................... 46
Figure 48 - Ex.1 Motor Amps Safety Calculation Table
.............. 46
Figure 49 - Ex. 1 Motor Amp Setpoint Calculations (Table A)
..... 46
Figure 50 - Ex. 2 Motor Amps Safety Calculation Table
.............. 46
Figure 51 - Ex.2 Motor Amp Setpoint Calculations (Table B)
..... 46
Figure 52 - Ex. 3 Motor Amps Safety Calculation Table
.............. 47
Figure 53 - Ex. 3 Motor Amp Setpoint Calculations (Table A)
..... 47
Figure 54 - Ex. 4 Motor Amps Safety Calculation Table
.............. 47
Figure 55 - Ex. 4 Motor Amp Setpoint Calculations (Table A)
..... 47
Figure 56 - Motor Screen VFD Setpoints
.................................... 47
Figure 57 - Motor Screen Capacity Control Setpoints
................ 48
Figure 58 - Example 1 VFD and Capacity Control Setpoints
...... 49
Figure 59 - 5:1 Turndown Suggested Control Strategy
............... 50
Figure 60 - Example 2 VFD and Capacity Control Setpoints
...... 50
Figure 61 - Compressor Safeties Screen
................................... 51
Figure 62 - 2:1 Turndown Suggested Control Strategy
............... 52
Figure 63 - Example 2 VFD and Capacity Control Setpoints
...... 52
Figure 64 - Capacity Control Setpoint Screen
............................ 53
Figure 65 - Vyper Logic Board
.................................................... 53
Figure 66 - Logic Board SW3
..................................................... 53
Figure 67 - Vyper Logic Board
.................................................... 54
Figure 68 - FLA Trim Pot
............................................................. 54
Figure 69 - Job FLA on the Vyper Screen
.................................. 54
Figure 70 - Control Logic Board
................................................. 55
Figure 71 - Filter Logic Board
..................................................... 55
Figure 72 - Power Module Screw Tightening Sequence
............. 57
Figure 73 - Logic Board Test Button
........................................... 58
™
Table 11 - Vyper
Output Power Lead Torque Specifications
.... 28
Table 12 - Comm1 Setpoints
..................................................... 40
Table 13 - PID Channel #5 Setpoints
......................................... 41
Table 14 - Binary Parameter Indicator Status
............................ 43
Table 15 - Applied Motor FLA Calculation
................................. 45
Table 16 - High Motor Amps Safety Calculation Table
............... 45
Table 17 - High Motor Amp Setpoint Calculations (Table A)
...... 46
Table 18 - High Motor Amp Setpoint Calculations (Table B)
...... 46
Table 19 - Limit Calculations
...................................................... 54
Table 20 - Fault Code List
.......................................................... 59
100-210 IOM (JUL 09)
Page 3
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
6
7
Advertisement
Table of Contents
Need help?
Do you have a question about the Vyper 700 and is the answer not in the manual?
Ask a question
Go to Questions and Answers
Related Manuals for Frick Vyper 700
Industrial Equipment Frick Vyper 305 Installation Operation & Maintenance
Variable speed drive unit (68 pages)
Industrial Equipment Frick IDSC2 Installation Operation & Maintenance
Stainless steel evaporative condenser (36 pages)
Industrial Equipment Frick LaZerWeld II Manual
Plate heat exchangers (22 pages)
Industrial Equipment Frick QUANTUM LX Service Manual
Evaporator (132 pages)
Industrial Equipment Frick YORK Refrigeration IDC Installation Operation & Maintenance
Induced draft evaporative condensers (32 pages)
Industrial Equipment Frick AcuAir Manual
Hygienic air units (58 pages)
Industrial Equipment Frick LZWII-2M Installation Operation & Maintenance
(22 pages)
Industrial Equipment Frick IDSC Installation Operation & Maintenance
Stainless steel evaporative condenser (36 pages)
This manual is also suitable for:
Vyper 572
Vyper 912
Vyper 752
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the Vyper 700 and is the answer not in the manual?