Commissioning, inspection, maintenance

Switching on the power and starting the commissioning sequence

After switching the power on, a commissioning
sequence commences. If it does not start automati-
cally, press
and
simultaneously for approx. 5 s.
Ù
Ú

Setting the language

Shortly after switching the power on, the display shows
"Select language".
Press the following keys:
1.
/
for the required language.
|
~

Setting the data

Press the following keys:
1.
/
for the required date.
|
~

Setting the time

Press the following keys:
1.
/
for the required time.
|
~

Configuring the supply system/charging scheme

The supply system is set at the factory for discharge
from a pellet silo with a vacuum supply system (setting
"1")
30
While making the following inputs, these keys may
also be pressed:
to go back one step
ä
to display the commissioning menu structure
å
2.
to confirm.
d
The display shows "Date set".
2.
to confirm.
d
The display shows "Time set".
2.
to confirm.
d
Press the following keys:
1.
/
for the required supply system "0", "1", "2"
|
~
or "4".
2.
d
to confirm.