Connecting An Aui Cable To An Epim-X - Cabletron Systems NBR-220 Installation Manual

Nbr-series network bridge routers
Hide thumbs Also See for NBR-220:
Table of Contents

Advertisement

3.5.2 Connecting an AUI Cable to an EPIM-X

The signal quality error (SQE) switch remains in the OFF
!
position for most network connections. However, some Data
Terminal Equipment (DTE) requires SQE. Refer to your DTE
CAUTION
manual for SQE requirement information.
Connect an EPIM-X to a device not requiring SQE as follows:
1. Check that the SQE LED on the EPIM-X is OFF. If the SQE LED is
ON, check the position of the SQE switch.
If the SQE light remains on, even though the SQE switch is in
NOTE
the OFF position, contact Cabletron Systems Technical
Support.
2. Attach one end of an AUI cable, no longer than 50 meters in length, to
the port located on the EPIM-X (Figure 3-14) and the other end to the
intended node.
ON Position
(Toward Back
of EPIM)
NBR-SERIES Installation Guide
OFF Position
(Toward Front
of EPIM)
Figure 3-14 The EPIM-X
Connecting the NBR to the Network
1092_16
Page 3-19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nbr-620Nbr-420

Table of Contents