06 . Password setting screen
07 . DN code setting screen
List of the DN Codes (MC)
DN
Description
code
Continue operation when
14
GC communication failure
occurs
System A: Failure setting at
42
POFF
System A: Ratio of units with
43
major failures confirmed (%)
System A: Operation
44
continues when a major
failure occurs
System A: Pump
45
pre-operation time (sec)
System A: Pump remaining
46
operation time (sec)
System B: Failure setting at
82
POFF
System B: Ratio of units with
83
major failures confirmed (%)
System B: Operation
84
continues when a major
failure occurs
System B: Pump
85
pre-operation time (sec)
System B: Remaining pump
86
operating time (sec)
• Select "06. Password setting" from
appears.
• The password must be 4 digits. Choose a number between
0000 and 9999.
• You can change the digits with
• You can change the numeric value with
• When you press
are any changes.
• Refer to "When confirming on the message screen" for detailed
information about using the confirmation screen.
• Select "07. DN code setting" screen from
the left appears.
• You can change the DN code number with
• Press
change. The data entry screen appears.
• Refer to the "Value input" screen for detailed information about
entering data.
• When you press
are any changes.
• Refer to "When confirming on the message screen" for detailed
information about using the confirmation screen.
Initial
Min. Max.
value
Set whether to continue operation in case of failure in communication with GC.
−1: System operation stopped
1
−1
1
0: Thermo OFF (minimum number of pumps operating)
1: System continued operation
Set whether to treat it as a failure if system A pump stops during pre-operation.
0
0
1
0: Do not treat as failure
1: Treat as failure
100
1
100 Set the failure ratio of UC for system A with major failure confirmed.
Set whether to continue operation when system A has a major failure.
0: If the ratio of units with major failures confirmed is exceeded, stop operation
2
0
2
1: If all UCs have major failures, stop operation
2: Even when all UCs have major failures, MC continues operation and UC resumes
operation after recovery
15
10
180 Set the pump pre-operation time of system A.
15
10
180 Set the pump remaining operation time of system A.
Set whether to treat it as an failure if system B pump stops during pre-operation.
0
0
1
0: Do not treat as failure
1: Treat as failure
100
1
100 Set the failure ratio of UC for system B with major failure confirmed.
Set whether to continue operation when system B has major failure.
0: If the ratio of units with major failures confirmed is exceeded, stop operation
2
0
2
1: If all UCs have major failures, stop operation
2: Even when all UCs have major failures, MC continues operation and UC resumes
operation after recovery
15
10
180 Set the pump pre-operation time of system B.
15
10
180 Set the pump remaining operation time of system B.
, a confirmation screen appears if there
according to the DN code number you want to
, a confirmation screen appears if there
●: Restarts when set
▲: Items that can be displayed (can be set) as custom options
○: Items that can be set by the user (standard)
Description
- 34 -
. The screen on the left
and
.
and
.
. The screen on
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ruagp511hlzg3tr

Table of Contents