Download Print this page

Polanik S-250 Instruction Manual

Competition long jump and triple jump take-off board set with stainless steel foundation tray lowered edges and wooden base board

Advertisement

Quick Links

INSTRUCTION MANUAL
Competition long jump and triple jump take-off board set
with stainless steel foundation tray lowered edges
and wooden base board
S-250
(ver. 2017)
SAFER JUMPS TECHNOLOGY
File: 2018-01-04
PRODUCT SUPPORT
Pawel Ciechanowski
p.ciechanowski@polanik.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the S-250 and is the answer not in the manual?

Questions and answers

Summary of Contents for Polanik S-250

  • Page 1 INSTRUCTION MANUAL Competition long jump and triple jump take-off board set with stainless steel foundation tray lowered edges and wooden base board S-250 (ver. 2017) SAFER JUMPS TECHNOLOGY File: 2018-01-04 PRODUCT SUPPORT Pawel Ciechanowski p.ciechanowski@polanik.com...
  • Page 2: Table Of Contents

    VII. IAAF certificate I. General characteristics The take-off board S-250 is designed for conducting sports events and training programs of horizontal jumps. Main features of the take-off board:  construction according to the latest safety recommendations – no metal elements in take-off zone, so...
  • Page 3: Parts List (Part Sets)

    (lowered edges) with accessories for concreting (draining tubes and spacing boards) K3-250 Wood base board S-250-01-01 White take-off board with screws K1-250 Indicator plasticine board S-250-02-00 Training indicator board without plasticine S-250-02-03 Plasticine 300 g S-250-02-01 Instruction manual S-250 ver. 2017 3/11...
  • Page 4: Assembly And Installation

    For any other competition, the distance shall be adjusted to competitors` level. The installation point of the tray (item 1) of the take-off board is presented below. Drawing no. 1. Installing the take-off board – general view Instruction manual S-250 ver. 2017 4/11...
  • Page 5 1 and draw. no. 2), so that it does not deform while placing the concrete. Deformations can make the plasticine board (item 4) or training board (item 5) block inside the tray. Image no. 1. Installed tray secured with spacing boards Instruction manual S-250 ver. 2017 5/11...
  • Page 6 During the embedding process of the tray (item 1), draining tubes can stick out over the foundation tray bottom. After the concrete setting, the sticking tube ends are to be cut off as close to the tray bottom as possible to ensure the correct water outflow. Instruction manual S-250 ver. 2017 6/11...
  • Page 7 When the base board (item 2) with the white take-off board (item 3) are properly mounted, the indicator board (item 4 or item 5) can be put into the tray (item 1). Instruction manual S-250 ver. 2017 7/11...
  • Page 8: Remarks On Maintenance And Operating

    Even the best technical solutions cannot substitute for common sense. The usage of the product must take place under the supervision of qualified sports arena staff and trainers. The producer shall not be liable for any incidents caused by the improper take-off board installation, assembly or its misuse. Instruction manual S-250 ver. 2017 8/11...
  • Page 9: Technical Drawing - Installed Take-Off Board

    – white take-off board (item 3) e – wooden base board (item 2) f – athletics synthetic surface g – concrete h – plastic grid (item 9) i – ground j – draining tube Instruction manual S-250 ver. 2017 9/11...
  • Page 10: Additional Equipment, Available Separately

    Plasticine straps for indicator board P8x31 Set of 8 red plasticine straps, specially shaped, ready to be put into the indicator board recess, designed for Polanik competition take-off boards Rubber indicator board for competition board LG15-250 black full rubber indicator board designed for...
  • Page 11: Iaaf Certificate

    VII. IAAF certificate Instruction manual S-250 ver. 2017 11/11...