Turbocharger Weights; Removing The Turbocharger - ABB TPS 61D01 Operation Manual

Hide thumbs Also See for TPS 61D01:
Table of Contents

Advertisement

Operation Manual / TPS48-D/E.. - TPS61-D/E..
7 Removal and installation / 7.2 Turbocharger weights

7.2 Turbocharger weights

7.3 Removing the turbocharger

© Copyright 2020 . All rights reserved.
Lifting gear with a sufficient load limit must be used for removing and
installing the turbocharger. The following weight specification is the
heaviest variant possible. This standard value may deviate from the data
on the rating plate depending on the specification.
TPS48
[kg]
180
Disconnect all exhaust gas and air lines according to the instructions
u
of the enginebuilder.
Version with water-cooled bearing casing:
Disconnect the water pipes according to the instructions of the en-
u
ginebuilder.
If present, remove hard insulation as follows:
Remove screws and sheet metal (B) from the bearing casing insula-
u
tion.
Remove the remaining screws from the bearing casing insulation (A).
u
Pull the bearing casing insulation up and off. The bearing casing insu-
u
lation can be compressed to facilitate the removal process.
Unplug the cable connector from the speed sensor.
u
Attach lifting gear to bearing casing.
u
If a gas outlet bend is present, sling lifting gear around it or secure it
u
to the lifting gear with a swivel lifting eye (C).
HZTL2410_EN
TPS52
TPS57
[kg]
[kg]
250
410
TPS61
[kg]
650
Rev.F
March 2020

Advertisement

Table of Contents
loading

Table of Contents