ABB TPS 61D01 Operation Manual page 40

Hide thumbs Also See for TPS 61D01:
Table of Contents

Advertisement

Operation Manual / TPS48-D/E.. - TPS61-D/E..
4 Operation / 4.2 Servicing work
4.2.1 Service work every 25 ... 50 hours
4.2.2 Servicing work according to the engine
Oil filter
4.2.3 Service work in accordance with instructions on
© Copyright 2020 . All rights reserved.
Visual inspection for air, exhaust gas, water and oil leaks.
u
Record operating data and enter it in the engine logbook.
u
Clarify the cause of any variances.
u
CAUTION
Unknown changes during operation
The consequences can range from an impairment to a breakdown.
Have unknown causes clarified by an ABB Turbocharging service sta-
u
tion.
manufacturer's instructions
Clean or replace oil filter in supply line to turbocharger when engine is
u
not running.
rating plate
(In general, after 8000 ... 16000 hours of operation)
Rotor and bearing parts must be inspected and assessed by an ABB Tur-
bocharging Service Station. The following work can be carried in prepar-
ation.
Remove cartridge group as described in chapter Disassembly and as-
u
sembly.
Measure clearances.
u
Clean turbine and compressor casings and check them for cracks and
u
erosion / corrosion.
Clean bearing casing and blow air through oil ports / holes.
u
Clean nozzle ring and check for cracks and erosion.
u
HZTL2410_EN
Rev.F
March 2020

Advertisement

Table of Contents
loading

Table of Contents