Download Print this page

U-Line H-1106 Manual page 4

Counter high cabinet

Advertisement

Available languages

Available languages

6. Place rear flange of the bottom (6) into the bottom
lances of the back. The flange with the two holes
should face the front, hanging over the sill. Insert
bolts through the bottom and sill with the head
facing the front of the unit. Secure with two nuts.
(See Figure 6)
7. Set the unit upright and tighten all nuts and bolts
around the entire unit.
8. Insert the shelves (5) at desired levels. (See Figure 7)
5
NOTE: To place the shelves, tilt the shelves
slightly to the left or right before inserting into
the unit.
9. Attach the left door (8) to the unit by placing the
door on the hinges, aligning the hinge holes,
dropping the pins (15) into the slots, then placing
the flat end of a screwdriver on the hinge pins and
tapping them in with a hammer. (See Figure 8)
PAGE 4 OF 15
ASSEMBLY CONTINUED
Figure 6
6
Figure 7
8
10. Attach the right door (9) to the unit in the same way
the left door was attached. (See Figure 9)
NOTE: If having issues with doors aligning, it
may be due to cabinet not sitting level. Use
included nut driver to adjust leveling feet in
bottom front two corners. Nut driver should
insert through inside of cabinet down into feet
and adjust as needed.
Figure 9
HANDLE/LOCKING SYSTEM INSTALLATION
1. Place the locking handle (11) on the right hand door
and fasten with two #8-32 x 1/4 slotted hex-head
bolts and lock washers. (See Figure 10)
Figure 8
15
9
Figure 10
11
0321 IH-1106

Advertisement

loading

This manual is also suitable for:

H-3618