Cedar Ridge CRHEB24RT Owner's Operation And Installation Manual page 20

Table of Contents

Advertisement

3. Insert pin on the back of log #4 into slot
in rear log bracket on grate base (see
Figures 21 and 22).
4. Insert pin on the bottom of log #5 into
hole in log #4, with the other end placed
on grate base (see Figure 23).
5. Insert pin on the bottom of log #6 into
hole in log #4, with the other end placed
on grate base (see Figure 23).
6. Insert the pin on the bottom of log #7 into
hole in log #4, with the other end placed
on grate base (see Figure 23).
7. Insert the pin on the bottom of log #8 into
the hole in log #3. Rest the front edge onto
log #4 (see Figure 24).
8. Turn log #9 as shown in Figure 26. Insert
log #9 in front of rear log bracket on grate
base, inserting pin on the rear of log, into
slot on rear log bracket (see Figure 24).
9. Place lava rock on the floor in the front of
the burner (see Figure 25).
10. Place log #10, #11, #12 and #13 on top of
lava rock in front of burner (see Figure 25).
Slot for Log #4
Figure 21 - Installing Log #3
Log #4
Figure 22 - Installing Log #4
20
INSTALLATION
Log #3
www.usaprocom.com
IMPORTANT: Make sure logs do not cover
any burner ports. It is very important to install
the logs exactly as instructed. Do not modify
logs. Use only logs supplied with heater.
Log #5
Figure 23 - Installing Logs #5, #6 and #7
Log #9
Figure 24 - Installing Logs #8 and #9
Lava
Log #10
Log #11
Rock
Figure 25 - Installing Lava Rock and
Logs #10, #11, #12 and #13
Log #6
Log #7
Log #8
Log #12 Log #13
200015-01B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Crheb30rt

Table of Contents