6.
P
RECAUTIONS ON INSTALLATION
NOTICE
If drain holes of the outdoor unit are
covered by a mounting base or by
floor surface, raise the unit in order
to provide a free space of more
than 100 mm under the outdoor
unit.

6.1. foundation work

Check the strength and level of the installation ground so that
the unit will not cause any operating vibration or noise after
installation.
In accordance with the foundation drawing in the figure, fix the
unit securely by means of the foundation bolts. (Prepare 4 sets
of M12 foundation bolts, nuts and washers each which are field
supplied.)
It is best to screw in the foundation bolts until their length are
20 mm from the foundation surface.
ERHQ
A
140
B
47
423
614
ERLQ
A
140
620
B
35
60
182 154 159
A
Discharge side
B
Bottom view (mm)
C
Drain hole

6.2. Drain work (only for ERHQ)

Check in the combination table under
whether drain work is allowed. In case drain work on your unit is
allowed and the installation site requires drain work, then follow the
guidelines below.
Drain kits for drainage are available as option.
If drain work from the outdoor unit causes trouble (for example, if
the drain water may splash on people) provide the drain piping
using a drain socket (optional).
Make sure the drain works properly.
ERHQ011~016BAV3+W1 + ERLQ011~016CAV3+W1
620
140
C
140
C
"Possible options" on page 5
Outdoor unit for air to water heat pump
4PW57794-1 – 08.2010

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents