Assembly instructions
1.
To install the four fascia mounting bolts:
a.
Remove the bolts and washers from
the supplied kit bag.
b.
Put washers onto the bolts.
c.
Screw the mounting bolt with washer
into the chassis leaving approximately
1" (25mm) to hang the fascia.
2.
Ensure the white panel fasteners holding
the fascia polystyrene are pushed firmly in
(fasteners may have loosened in transit).
3.
Lift the fascia onto the chassis mounting
bolts. Align the key hole brackets with
the mounting bolts and slide the fascia
forward to lock into position.
4.
On Cassette 24 and 36 units connect the
vane motor plug by plugging it into the
socket connection on the chassis.
a.
Ensure that the polarized connector
(2 position) is in the proper orienta-
tion and connected.
b.
Route the wires in a way that ensures
they won't become trapped, cut, bro-
ken or chaffed.
5.
ONLY Cassette "G" models (CACG/
CAHG) contain a second cable connec-
tion to the control box for the Infrared
Unit Mount Control.
6.
Ensure that the polarized (10 position)
connector is in the proper orientation and
connected.
7.
Route the wires in a way that ensures that
they won't become trapped, cut, broken,
or chaffed (Figure 22, Page 19).
8.
The fascia can now be tightened up to the
Cassette chassis. make sure a good seal is
obtained between fascia and chassis, this
is necessary to prevent recirculation.
9.
With filter(s) in place, the inlet grille(s)
can now be installed onto the fascia.
P/N 240007756, Rev. A [051509]
CACG/CAHG & CACH/CAHH
• Installation, Operation and Maintenance Manual •

Final Assembly

Figure 20
Figure 21
Figure 22
19
Air Handlers
Mounting bolts
White panel fasteners must be
pushed in
Wire routing
Made in the USA