Duct Connections - ECR EMI America Series Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

Branch duct and fresh air duct collars can be
attached to the cassette chassis by following
the steps below.
NOTICE
Recommendation — no more than
10 feet (3m) of branch duct or fresh air
duct should be installed.
1.
Locate the knock-out holes (
Page 14).
NOTICE
The number of knockouts varies with
unit size.
Branch duct knock-outs are 5¼"
(133mm) round.
Fresh air knockouts are:
1¼" x 2½" (32 x 64mm) rectangular
on models 9 & 12.
3" (76mm) square on models 24
and 36.
2.
Cut the black insulation around the
knock-out (Figure 13, Page 14).
3.
Snip the tabs holding the knock-out in
place (Figure 13, Page 14).
4.
Remove the metal knock-out and the
black insulation behind it.
5.
Attach the duct collars (field supplied) to
the chassis using self-drilling screws.
6.
Repeat steps above for remaining duct
work.
Comfort where it counts
CACG/CAHG & CACH/CAHH
• Installation, Operation and Maintenance Manual •

Duct Connections

Figure 12
Figure 12,
Figure 13
14
Air Handlers
Knockouts
branch Duct knockout
Cassette 12
CAssette 24 & 36
Cut insulation and snip out
knockouts
P/N 240007756, Rev. A [051509]
fresh air
knockout

Advertisement

Table of Contents
loading

Table of Contents