ECR EMI America Series Installation, Operation And Maintenance Manual page 11

Table of Contents

Advertisement

Mounting method
In existing construction, remove enough
ceiling panels to provide clearance space
for mounting unit to ceiling joists.
Before beginning the installation, inspect
the unit location, test the strength of the
ceiling joists to insure they will support
the weight of the unit.
Determine mounting method:
On wooden beams use threaded rods,
washers, and nuts to suspend support
brackets.
With metal structures, secure thread-
ed rods on an existing angle or install
a new support angle.
On newly built concrete slabs secure
threaded rods with inserts and em-
bedded bolts.
For previously built concrete slabs
install hanging bolts with an expan-
sion anchor.
Follow local building codes for required
safety cables, braces, etc.
Ceiling opening
NOTICE
Make sure the ceiling grid is supported
separately from the Cassette. The ceiling
must not be supported by any part of the
Cassette unit, fascia or any associated
wiring or pipe work.
Cut an opening in the false ceiling with the
size shown in Table 2, Page 11.
Ceiling opening sizes
Table 2
Model
9 & 12
23¼" x 23¼" (591 x 591 mm)
24
337/8" x 337/8" (860 x 860 mm)
36
46" x 337/8" (1168 x 860 mm)
P/N 240007756, Rev. A [051509]
CACG/CAHG & CACH/CAHH
• Installation, Operation and Maintenance Manual •
Mounting the Unit
Dimensions
(continued)
Ceiling cutout/rod placement
Figure 6
template (shipped with unit)
rod
Positions
Ceiling rod positions
Table 3
A
Model
Dimension A
9 & 12
19 50" (495mm)
24
29 19" (740mm)
36
29 19" (740mm) 43 06" (1094mm)
Mounting brackets
Figure 7
11
Air Handlers
1.500 TYP
(51mm x 45°)
(38mm TYP)
2.000 x 45° TYP
B
Dimension B
22 87" (581mm)
30 80" (782mm)
bracket along
perforations
Made in the USA
rod
Positions
A
Fold

Advertisement

Table of Contents
loading

Table of Contents