Carrier 16LJ-F Series Installation Manual page 10

Absorption chiller
Hide thumbs Also See for 16LJ-F Series:
Table of Contents

Advertisement

(2) No-rust shall be observed on the Chiller.
(3) No-looseness shall be observed at each flange and bolted connections.
(4) No-looseness shall be observed at each Water header flange of the chiller.
(5) There shall be no-liquid leakage from the Chiller.
(6) No-damage shall be observed on all components of the Chiller.
(7) There shall be no-missing of all components of the Chiller.
(8) No-wire-cut shall be observed on electric wiring and piping.
7

Advertisement

Table of Contents
loading

Table of Contents