INSTALLATION MANUAL
Absorption Chiller
16LJ-F Series
Original language
ACQA36-00270

Advertisement

Table of Contents
loading

Summary of Contents for Carrier 16LJ-F Series

  • Page 1 INSTALLATION MANUAL Absorption Chiller 16LJ-F Series Original language ACQA36-00270...
  • Page 2 Please utilize the Chiller to its optimum performance by following recommended daily maintenance and handling, and periodic service. If you need any information about maintenance contract or any other inquiries, please contact Carrier service agent. DECLARATION OF CONFORMITY < for CE marking model >...
  • Page 3: Table Of Contents

    Absorption Chiller Installation Manual ****** ****** Table of Contents 1. Safety Precautions ---------------------------------------------------------------------------------------------- 2. Installation 2-1. Installation plan ------------------------------------------------------------------------------------------ 2-2. Rigging work and safety precautions -------------------------------------------------------------- 2-3. Carrying-in with rolling work -------------------------------------------------------------------------- 2-4. Procedure and note for horizontal pulling installation ------------------------------------------ 2-5.
  • Page 4: Safety Precautions

    1. Safety precautions Be sure to follow the instructions and requirements on safety described in this manual. We explain about a harm or damage if a chiller is used with mistaken usage ignoring these precautions. Failure to observe this instruction may cause serious injury or death. WARNING Failure to observe this instruction may result in impediment or damage CAUTION...
  • Page 5 CAUTION The machine room shall be finished with Ventilate the machine room whenever waterproof floor nitrogen pressurized test is performed The machine room shall be finished Fully ventilate the machine room with waterproof floor to protect whenever nitrogen pressurized test is surrounding equipments and facilities performed on the unit or piping.
  • Page 6: Installation

    2. Installation 2-1. Installation plan It is very important to make an installation plan of the absorption chiller because it is relatively large machinery in the air-conditioning system. The construction form of the air-conditioning system is on-site assembly of the various equipments therefore it is necessary to set a strict schedule to enable a timely installation of every required element depending on the status of progress of the construction work.
  • Page 7: Carrying-In With Rolling Work

    2-3. Carrying-in with rolling work Size of the equipment hatch and the carrying-in entrance shall exceed the overall dimension which is indicated on the specification. If the unit is rolled on logs, size of the rolls and soleplate shall be considered.
  • Page 8: Safety Precautions At The Installation On The Foundation

    2-7. Safety precautions at the installation on the foundation Put the chiller on the foundation slowly and gently with careful attention to the foundation bolts positions. Also pay attention to avoid falling or turnover accident. 3. Requirements for the foundation Refer to the information on the foundation as shown in the contract specifications.
  • Page 9: Foundation Bolts

    3-3. Foundation bolts Foundation bolts, washers and nuts are the scope of supply for purchaser. (1) Weld the washers on the chiller's frame. (2) Tight up the nuts. Foundation and anchor bolt Washer 26 Dia. Foundation 1 : Anchor bolt 2 : Nut 3 : Washer 4 : Base...
  • Page 10 (2) No-rust shall be observed on the Chiller. (3) No-looseness shall be observed at each flange and bolted connections. (4) No-looseness shall be observed at each Water header flange of the chiller. (5) There shall be no-liquid leakage from the Chiller. (6) No-damage shall be observed on all components of the Chiller.
  • Page 11 Manufacturer CARRIER SCS Route de Thil - BP49 01122 MONTLUEL CEDEX, FRANCE...